Youngjong Grand
  Bridge
Kwang-Ahn Grand
  Bridge
 
 

Outline
  Design Specifications
    • Design Speed : Highway 100Km/hr ,Railroad 110Km/hr
• Design Load : Highway Load DB-24,Rail Load Q25
• Sea Lane Specifications : Width 200m, Vertical Clearance 35m
• Average Wind Velocity : 40m/sec
• Design Seismic Intensity : 0.14G
  Size
    • Suspension Bridge: 125+300+125=550m
• Truss: 6×375 = 2,250m
• Steel Box Girder Bridge (Yong-jong Side): 1,140m
• Steel Box Girder Bridge (Inchon Side): 480m
• 49Piers(including 2 abutments)
Product Classification
ITEM Mat'L Q'ty Remark
Tower Saddle SCW480 4 Casting
Spray Saddle SCW480 4 Casting
Cable Band SCW480 90 Casting
Strand Shoe SC450 76 Casting
Anchor Bolts SNB24-5 152/304 Forging
Roller Shoe SCMn2A 32 Casting/Forging
Pin Shoe SCMn2A 12 Casting/Forging
Pot Bearings SCW480 1482 Casting
Spring Shoe NR/CR 8 Rubber
Wind Shoe SCW480 8 Casting
Link Shoe - 8 Forging
Hanger Collar SC450 312 Casting

Structural Analysis of Cable Band (Finite Element Method)
Finite Element Analysis
Casting Design
Inside Vigorous Test
“Certificate of Appreciation” for high performance in Young-Jong Grand Bridge Project

  For “Excellent Performance”
  Issued by “Samsung Corporation”
  Products : Pot Bearings, Strand shoe, Cable Band
 
 